In the current situation of normalized epidemic prevention and control, hospitals have increasingly high requirements for environmental purification. As an important material in hospital decoration, purification panels need to pay attention to what issues during installation? This article will explain in detail the precautions to be taken when installing hospital purification panels from four aspects: selection, installation, acceptance, and maintenance.


Ⅰ、 Selection

1. Material: The hospital purification board is generally made of environmentally friendly, fireproof, corrosion-resistant, and easy to clean materials, such as fiber cement board, rock wool board, etc.

2. Specifications: Select purification panels of appropriate thickness and size according to the needs of different functional areas in the hospital. For areas such as operating rooms and intensive care units, purification panels with larger thickness and good sound insulation effect should be selected.

3. Color: The color of the hospital purification board should conform to the overall decoration style of the hospital, generally using elegant and clean tones to alleviate patients' anxiety.

Ⅱ、 Installation

1. Construction preparation: Before installation, ensure that the construction site is clean and free of debris, and prepare the necessary tools and materials.

2. Plate cutting: According to the design drawings, accurately cut the purification plate, paying attention to the flatness of the cutting edge and avoiding burrs.

3. Installation and fixing: Use professional fixing parts to fix the purification board on the keel, ensuring the flatness and firmness of the installation.

4. Seam treatment: The seams between the purification boards need to be sealed with special sealant to ensure good sealing effect and prevent dust and bacteria from entering.

5. Equipment installation: Install lighting fixtures, ventilation openings, and other equipment correctly according to design requirements, ensuring that they are tightly integrated with the purification board to avoid air leakage.

Ⅲ、 Acceptance check

1. Appearance inspection: Check whether the purification board is installed smoothly and firmly, and whether there are any damages, scratches, or other issues on the surface.

2. Sealing inspection: Check whether the sealant at the joint is evenly applied and not missed, to ensure good sealing.

3. Equipment inspection: Check whether the installation of lighting fixtures, ventilation openings and other equipment is firm and the position is correct.

Ⅳ. Functional testing: Conduct negative pressure testing to ensure that the purification board has good air tightness and filtering effect. 4. Maintenance.

1. Regular cleaning: According to the hospital's needs, regularly clean the surface of the purification board to ensure its durability.

2. Damage repair: When problems such as damage or deformation are found in the purification board, timely repair or replacement should be carried out to ensure its normal use.

3. Replacement cycle: Regularly evaluate whether replacement is necessary based on the usage and effectiveness of the purification board. In short, the installation of hospital purification panels is a complex project that requires comprehensive consideration of multiple aspects such as selection, installation, acceptance, and maintenance. I hope that through the introduction in this article, it can provide useful references for hospital managers and construction personnel in the installation process of purification panels.